成人高清网站_国产区成人av在线观看_欧美精品亚洲天堂_VIDEOS成熟少妇_蜜桃a视频在线观看_精品综合久久久久久99_免费观看一级大片_久久久久人妻精品一区三寸中文字幕

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator nitrogen filling vehicle operation steps

未標題-1.jpg

  

Operation steps of the accumulator nitrogen filling vehicle:

The first step: first open the control box three-wire power supply (380V);

Step 2: Open the unloading valve (position reference manual) on the hydraulic module of the pump station until the system oil pressure drops to 0 MPa (ie, the pressure gauge shows 0);

Step 3: Open the top cover of the accumulator, then unscrew the black cap inside, and rotate the handle of the nitrogen-filled special tool to the maximum position (counterclockwise to the maximum), connect the accumulator, and press the special tool handle. Rotate clockwise. When you hear the sound coming out of the gas, observe the pressure gauge on the tool. The pressure display value is the pressure of the accumulator. At this time, turn it counterclockwise to the maximum and remove the special tool.

When the pressure is less than 5 MPa, it is necessary to flush the accumulator. The above is the detection process.


团风县| 彰化市| 大荔县| 民勤县| 贺兰县| 嘉黎县| 湖口县| 观塘区| 北安市| 伊川县| 汝南县| 绥阳县| 阿勒泰市| 新安县| 丰顺县| 谢通门县| 平谷区| 亳州市| 吉林省| 铜陵市| 社旗县| 岳西县| 榆社县| 延边| 盐亭县| 进贤县| 吕梁市| 台前县| 乳山市| 邮箱| 信丰县| 双江| 扬州市| 皮山县| 龙口市| 祁阳县| 宜良县| 娄烦县| 吉林市| 定州市| 兴城市|